New Construction by Timber Creek Builders. Currently in the drywall stage, still time to pick out interior colors, hurry now to beat the multi-offers when it's finished. Estimated to be complete in July 2024. Very popular open floor plan with 9ft ceilings. White kitchen cabinets, trim and doors. Granite counter tops, LVP flooring on the main floor, carpet in the bedrooms. Large walk in master closet. Full basement with painted walls and epoxy concrete floor for a great finished feel. Epoxy garage floor with Upgraded18x8 insulated OH door. 20ft concrete driveway, rear concrete patio.
6114761
Single Family, Traditional, 1 Story
3
WOOD
2 Full
2024
0.3426
Acres
Public Water
1
Stone, Vinyl Siding
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...