JP Brooks Presents the Arbor split level home, with an unfinished lookout basement, on cul-de-sac lot in the desirable Elk Wynd Creek community with nearby walking path to town and easy access to hwy 10! Upgraded kitchen with painted cabinets, crown molding, hardware, stainless steel appliances, roll out trash and recycle, vinyl plank flooring and vaulted ceilings. Spacious primary suite that is vaulted with ceiling fan, with 3/4 bath and walk-in closet. The main level includes a total of 3 bedrooms. The unfinished lower level could include a spacious family room, two additional bedrooms, and a bathroom in the future for an additional 964 square feet! Onsite finished trim for no nail holes! Pictures, photographs, colors, features, and sizes are for illustration purposes only and may vary from the home that is built. TO BE BUILT HOME construction starts mid May with a completion date of August, 2024!
6509919
Single Family, Other
3
Sherburne
1 Full/1 Three-Qtr
2024
0.33
Acres
Public
Brick,Vinyl siding
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...