This lot is in Unit 50. City Water. This Lot has been Cleared, Filled, Pad Built and there is already a Water Meter hooked up onsite. This lot just needs to be Scraped and its ready to Build.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...