Seller will be adding some covenants and restrictions in the coming weeks and survey has been ordered. Some Septic soil test have already been completed by Seller. The Seller intends to complete a 1031 Exchange at the closing and buyers must agree to cooperate with a 1031 exchange. Seller may also request to delay the final closing for up to 120 days to provide time to locate a replacement property. An 8 inch perimeter drain is already installed to the west. Seller will be adding at the rear of tracts 4 and 5 a drainage easement and will install another smaller tile to allow both tracts 4 and 5 to connect to the 8 inch drain. Land is leased to a Tenant Farmer for 2023 and Seller will retain the 2023 Crop Income.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...