Easy access, level, ready to build land with plans and some fees already paid, including tapfees for shared well, electric permit and building permits. Architectural drawings are complete and permited. Premier SIP engineered structural deposit paid. The bus stop is less than a block away.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...