Waterfront lot ready for a new home or camp on the dead end of the waterway with no through traffic. 15 - 16 x 16 rebar embedded concrete piles installed in 2020. Two boat slips. Oversized deck. Railings and stairway are not stable. DO NOT access the deck.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...