20 units - a mix of (6) 2/1 and (14) 1/1 constructed in 1963. 5.7% cap on actuals. Recent improvements include (2018) - full repaint, drivelane asphalt removed and replaced with 3" of new hot asphalt (2019) - concrete replacement to walkways around perimeter of property and for car ingress / egress (2021) - asphalt sealcoat and restripe.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...