All work has been done with permits and engineered plans. The home has been remodeled from the ground up. new rear foundation and half of the front foundation has been replaced. Updated electrical through-out, updated plumbing through-out, All new dual pane windows, All new insulation including the interior walls. All new sheet rock with tape, texture, paint and moldings. New Luxury Vinyl flooring through-out main floor and upstairs Primary bedroom. Recessed LED lighting in most rooms. New forced air heater. The main floor had been re-engineered to allow a larger free span area in the basement. It can be finished out as an ADU or it can be finished as a multigenerational living space with two bedrooms, two bathrooms and a living area.
41055459
Single Family, Traditional, 2 Story
3
San Francisco
2 Full
1928
0.08
Acres
Public
2
Frame,Stucco
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...