House is 60% complete. AS of today home has been completely rewired all the way to the pole, new roof, new plumbing inside and out to main sewer, new windows, new water heater , new tub and new exterior paint. What's left sheetrock, flooring and appliances.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...