New Construction-this home is under construction, completion approx. late fall 2024 to early spring 2025. The Willow is brand new plan, 2 story, 3 bedrooms, a loft, 2nd floor laundry, an attached 2 car garage and a basement that will be ready for finishing. The Willow features an open floorplan on the main level with an outdoor patio off the kitchen/dining area. The 2nd level includes a loft, laundry, 3 bedrooms, a nice sized primary suite with walk in closet. Primary bath and bath 2 both include double sinks. This home is at the point where the buyer can still choose interior finishes for a short time.
60299063
Condo, Townhouse, Contemporary, 2 Story, Townhouse, Condo
3
Washtenaw
2 Full/1 Half
2024
Public Water
2
Brick
Public Sanitary
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...